How long does it take to roof a 1100 sq ft house??
Question:
Answers:
I guess that would depend on who's doing it, what type of roof it is, if the old roofing material needs removed, Etc, Etc.
To remove shingles and reshingle ( asphalt type ) will take about 2 or 2 1/2 days usually. Once again it depends a lot on the number of people working on it and their experience level.
5 hours
Typically, it takes 2 man-hours per square to apply an asphalt roof. A square is 100 square feet, but since your roof isn't flat, you have more than 11 squares involved.
Is this a tear-off? Is the roof steep? There are lot of factors involved.
If you have to take the old roof off it will take considerably longer.
To just install the new roof (without knowing any details) should take about three days.
I am basing my answer on my 1400 sq. ft. house that I have re-roofed that took about four days.