Bathroom Floor Tiling?


Question:I'm gutting my bathroom and will be tiling the floor and then adding a new vanity and a new toilet.

The question is, do you tile before you put in the toilet and new vanity or do you put in these items first and then tile around them?

Concrete slab foundation that I'm currently working on leveling.

Answers:
"SOME" 10 point answers so far. I hope you acknowledge all of them. The issue relates to what you might want to change, "Down the road" and please know that home builders, don't usually do any flooring under a vanity,,,sigh.

I've installed multiple thousands of sq. ft. of flooring, and have re-modeled more bathrooms than anything else, and have to say if nothing is in the bathroom yet, your looking at installing not much more than a 30x24 inch area of tile UNDER where the vanity will be, and less under where the toilet will be. At current prices, and without the added labor you're cost might be less than another $50 for the better way to go. Seems logical to me.

Still, give everyone above me some thanks.

Tiling, sheet vinyl, hardwood, Solid GOLD, UNDER a toilet is a natural assumption, and allows for NO odd cuts. Assume however, that one day you might want a pedastal sink as opposed to that "GLIT" vanity. If you install flooring Under, it'll still be there, if you change your notion. Very realistically TILE, etc. Will NOT be on the shelf, to match, 5 years from now.

Steven Wolf


Put in the vanity first, then the tile and then the toilet.
Definitely before. Its just the right way, and anyway you'd have to do a lot more intricate cuts to make it look right. Also, mark where the vanity will sit and just go a couple of inches underneath and you can save a few tiles.


After Diy Doc's answer, let me add that if you finish and didn't break too many tiles cutting them and have the extras, by all means fill in under the vanity the next day if you want. I just didn't want you to run short. Thanks Doc
Do all of your tiling first. If you will be painting at all, make sure you do THAT first. Do anything above the floor first, then lay your tiles then put your toilet and sink in. If you put the toilet and sink down first, your tile cutting will be 10 times worse. Just make sure you put a sealer over the tiles too.
You want to tile first, tile last forever. You may want to change your vanity eventually, or you may want a different type of toilet in the future. If you have your tile down first, these changes will not matter. Also, tile doesn't ruin if you have a leak and water damage. If you tile first, you just pick out new things. If you put in the stuff first, you will have to buy exactly the same thing.
Vanities are heavy and you risk cracking the tile if you put it in after. The toilet needs to be put in after but will need an extender around the wax ring since you will have raised the height of the toilet and it will no longer be flush to the iron sewage pipe. Make sure you caulk around the toilet after installation.

More Related Questions & Answers...
  • Is it hard to install a tub wall?
  • *** how do i laminate an autographed soccer ball? ***?
  • When doing vinyl siding in a house, could install over existent wood singles?
  • Can i use romex 12/3 wire for 20 amp?
  • What do I need To Do First ??
  • How big a generator do I need for a small camper with a refrigerator, lights, and an air conditioner?
  • How do you remove vertical blinds, (the whole contraption)?
  • Glue on the screen..help!?
  • Can I add a receptacle.?
  • How long does semi-transparent stain last before it needs to be re-stained, on exterior wood?
  • This article contents is create by this website user, FindHomeAnswers.com doesn't promise its accuracy.
    Copyright 2007-2008 FindHomeAnswers.com     Contact us    Terms of Use

    Home and Garden